Licensed New York contractorsPhones answered 24/7(315) 640-3590
$100 off your first job, credited by us. Terms apply.

Bronx, NY

HPD Mold Violations in the Bronx: The Owner's Sequence

A dated violation is a sequence problem before it is a repair problem, and the sequence is what we line up for you.

10 sq ftWhere New York licensing takes over
2 companiesIndependent licensed parties the law requires above that line
20,424Mold violations city inspectors wrote in the Bronx in 2024
Get In Touch

Violation Response quote in Bronx

Tell us what you can see, where the water came from, and whether the building is yours or somebody else's. That is usually enough for us to say which trade you need, and who is on the hook for paying, before anyone comes out.

Would you rather talk it through? Call (315) 640-3590, answered 24/7.

$100credit

$100 off your first job

Credited by us on your first booked job.

  • One credit per customer per property, on your first booked job.
  • Valid through December 31, 2026.
Start Your Quote

Mention this offer when you book. Full terms.

Four quick questions, then your details. It takes about half a minute.

Question 1Who decides what happens at this property?

In New York City this is the first thing that has to be settled, because the duty to fix mold in an apartment building sits with the owner.

Question 2What are you looking at?
Question 3Is anything still wet?

This is the answer that decides how fast anyone needs to move.

Question 4How soon do you want someone there?
About the property

Who should we ask for?

How can we reach you?

We call to confirm the details before anyone is sent out.

Where is the property?

The contractor match is by property, not by person, so the street line matters.

Anything else we should know?

Your $100 credit is attached to this request. Mention this offer when you book. See terms.

Your details are used only to respond to this request and arrange the service.

Deciding

What an owner or managing agent should line up first

Work backwards from the certification rather than forwards from the crew. The document the city eventually wants names two independent licensees, so hiring a single firm that offers to handle everything produces paperwork HPD cannot accept and burns the correction window while you find out. The other thing worth knowing early is that a pattern costs more than an incident: buildings carrying open uncorrected class B and class C mold or leak violations can be pulled into the Underlying Conditions Program, and 57 of the 104 buildings selected citywide in the 2025 round were Bronx addresses, with 34 of the 61 orders issued going to them.

  1. Read the class, then count backwards from the date

    Class A allows 90 days, class B 30 and class C 21. The area measured in one room set that class, and it also sets how much sequencing time you actually have.

  2. Two licensees, two affidavits, one certification

    The remediator swears to the work, the assessor swears to the clearance, and the owner certifies the correction with proof of both filings attached.

  3. A repeat is a different conversation from a first notice

    Open class B and C mold or leak violations can trigger an architect or engineer report on the roof or facade and a four month deadline to fix the cause.

How violation response works →

Local Detail

What the 2024 Bronx violation count and the 2025 orders show

Damp white-painted brick basement wall with standing water in a floor drain basin

New York City housing inspectors recorded 20,424 mold violations in the Bronx in calendar year 2024, out of 46,780 citywide. Brooklyn recorded 13,641, Manhattan 6,426, Queens 5,244 and Staten Island 1,045.

Source: New York City Open Data, Housing Preservation and Development Housing Maintenance Code Violations, accessed 2026-09-16

Of the 104 buildings selected citywide for HPD's 2025 Underlying Conditions round, 57 are in the Bronx, holding 1,603 of the 2,952 units involved and 764 of the 1,367 qualifying mold and leak violations, and 34 of the 61 orders issued went to Bronx buildings.

Source: New York City Department of Housing Preservation and Development, FY25 Indoor Allergen Hazard Report, accessed 2026-09-16

The New York City rule implementing Local Law 55 states that where licensed workers are required to correct an indoor mold hazard under Article 32 of the state Labor Law or under Administrative Code section 24-154, the owner's certification of correction must include an affidavit from the remediator and an affidavit from the assessor, and proof that the remediator's remediation plan and the assessor's final report were submitted to the Department of Environmental Protection.

Source: New York City Department of Housing Preservation and Development, Rules of the City of New York title 28 chapter 54, accessed 2026-09-16

Phones answered 24/7Talk to a person about what is in front of you right now.
Licensed New York contractorsMatched to the license the job needs, on either side of the city line.
Your assessor is never your remediatorState law forbids one company from doing both, and we keep the two genuinely apart.
In The Field

What violation response involves in Bronx

Local Context

Why 20,424 Bronx violations in one year is a sequencing problem

City housing inspectors recorded 20,424 mold violations in this borough in 2024, out of 46,780 across the five boroughs, so nothing about your notice is unusual and nobody is treating your building as a special case. What catches owners and managing agents out is not the repair. It is that the correction cannot be bought as one invoice: the city wants an affidavit from the remediator, a separate affidavit from the assessor, and proof both of their filings reached DEP before it will accept that the condition is gone.

Wet Bronx street of brick multi-family buildings with moss at stoop bases
Next Step

Holding a dated notice on a Bronx building?

Send the class, the room and the correction date and we will map the sequence.

Questions

What Bronx owners, agents and boards ask about a notice

The correction date is close. What can be compressed?

The assessment, usually, because it is the step with the queue in front of it. What cannot be compressed is the order: the plan exists before the work, the clearance report exists before the containment comes down, and the affidavits exist before the certification is worth filing.

We filed the certification of correction and HPD came back anyway. Why?

The department attempts to reinspect every class B and class C mold violation, and it upgrades a class where an owner does not correct or states falsely that the work was done. A certification with the two affidavits and the filing proof attached is what survives that reinspection.

Next Step

Send us the violation and the unit count

We will tell you which licensees your address needs, with no obligation.

Start Your QuoteCall (315) 640-3590
Start Your Quote